Language EN

Where to place a capsule

The capsule sits on a level, load-bearing floor on the ground. An engineer must assess any suspended floor before installation.

Ground01Suspended floorRoom below02
  1. Ground-bearing floor: yes
  2. Suspended floor: only after an engineer’s assessment

Ground-bearing floor: suitable in principle

Five settings, each with a plan and conditions to check.

LocationFloorWhat we checkPlacement
HouseGround-bearing floorFront door width, corridors and turns. Room doorway and clearance to open the capsule.Subject to checks
BasementGround-bearing floorStair width, landing and headroom. Basement and installation room doors.Subject to checks
GarageConcrete floorGarage door width and height. Clearance to open the capsule and walk past the car.Subject to checks
Production hallIndustrial floorHall entrance and forklift route. Spacing between capsules and room to open each entrance.Subject to checks
WarehouseIndustrial floorLoading ramp or door and main aisle width. Clear space around the capsule entrance, away from racks.Subject to checks

OGR-01 A suspended floor needs a structural assessment. An engineer must check whether it can bear the weight of the capsule.

Access and carrying in the parts

The capsule arrives in parts. We check the route from the vehicle to the installation site.

  1. Vehicle access and unloading

    Your contact at STALVARD will clarify the unloading area and requirements after your inquiry.

  2. Doors and gates

    We check the width and height of openings along the route.

  3. Stairs and turns

    We check stair width, landings and turns in corridors.

  4. Largest part

    Your contact will clarify its size and weight after your inquiry.

Unsure whether your site is suitable?

Describe it in your inquiry or call us. We check the site before quoting.